爱情片堕落色戒完整版在线|久久av伊人|久久视频在线播放|中日韩久久久,电视剧娘妻全集在线观看完整版,免费观看黄色网页,国产日韩精品久久

TEC Wins Traction System Order in Changsha Metro Line 1 PhaseⅠ

Date:2013-07-23 Author: Source:

Recently, TEC won traction system order of 23 trains with 138 cars in Changsha Metro Line 1 PhaseⅠfollowing the success in Changsha Metro Line 2, in which not only integration of traction, signal and braking system but also the first breakthrough of signal and braking system are achieved.

The whole line of Changsha Metro Line 1 phaseⅠis around 23.569 km long, which starts from North Bus Station and ends in Wanjiali Road Station with 20 stations established, running north-south. And it is expected to be open to traffic in September 2014.

Hits:297Top
Zhuzhou CRRC Times Electric Co., Ltd.
All Rights Reserved Private Policy